Mexico Savings & Rural Finance (BANSEFI) Project - Phase II

Resumen*

The Second Savings and Rural Finance Project will assist the Government of Mexico in strengthening the Savings and Credit Institutions sector with entities which are compliant with the Popular Savings and Credit Law, financially viable, and that are operationally effective, managerially improved, technologically upgraded, and having an enhanced level of outreach and access to financial services by the underserved Mexican population. The project has...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

The objective of the Project is to assist the Borrower in strengthening the SCI sector with SCIs which are compliant with the Popular Savings and Credit Law, financially viable, operationally effective, managerially sound, technologically upgraded, and providing an enhanced level of outreach and access to financial services by the underserved Mexican populations.

Llave Detalles

Proyecto Detalles

  • P087152

  • Closed

  • Pierre Colleye

  • N/A

  • México

  • 6 de enero de 2004

  • (a partir de la presentación ante el Directorio)

    29 de junio de 2004

  • 9 de diciembre de 2004

  • US$ 75.12 millones

  • C

  • No aplicable

  • 31 de julio de 2012

  • BANK APPROVED

  • 15 de enero de 2013

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
Foreign Private Commercial Sources (unidentified) 69.86
Borrower/Recipient 14.69
International Bank for Reconstruction and Development 75.12

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF 75.12
Compromiso de la AIF No Disponible
Compromiso del BIRF + AIF 75.12
Instrumento de Financiamiento
Monto a título de donación No Disponible
Costo total del proyecto** 159.67

Resumen del financiamiento del Banco Mundial (millones de US$) al 31 de julio de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 31 de julio de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Overall Safeguards Rating Satisfactory 2012-07-27
Overall Implementation Progress (IP) Satisfactory 2012-07-27
Procurement Moderately Satisfactory 2012-07-27
Project Management Satisfactory 2012-07-27
Progress towards achievement of PDO Satisfactory 2012-07-27
Counterpart Funding Highly Satisfactory 2012-07-27
Financial Management Satisfactory 2012-07-27
Monitoring and Evaluation Satisfactory 2012-07-27
Overall Safeguards Rating Satisfactory 2012-07-27

CALIFICACIONES DE LA TERMINACIÓN

INDICADORINFORME DE LA TERMINACIÓN DE LA EJECUCIÓN Y DE RESULTADOS: 01-31-2013
ResultadosSubstantial
Riesgo para los resultados de desarrolloModest
Desempeño del BancoModerately Satisfactory
Desempeño del prestatarioSubstantial
Desempeño del GobiernoSubstantial
Organismo EjecutorSubstantial

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

INDICADORREVISIÓN DEL ICR: 10-14-2014INFORME DE LA EVALUACIÓN DEL DESEMPEÑO DEL PROYECTO:
Calificación De Los ResultadosSatisfactory N/a
Riesgo Para Los Resultados De DesarrolloModerateN/a
Desempeño Del BancoModerately SatisfactoryN/a
Desempeño Del PrestatarioModerately SatisfactoryN/a
Desempeño Del GobiernoModerately SatisfactoryN/a
Organismo EjecutorModerately SatisfactoryN/a
Calidad Del IfeSatisfactoryN/a
Calidad De SyeSubstantialN/a

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • About 200 entities assisted by the project either certified by CNBV (the regulatory agency), or identified for liquidationValor370 entities already being assisted under the para517 entities assisted. 112 entities certified, 70 45 new entities received TA; TA completed for all
    Fecha9 de diciembre de 200414 de junio de 201231 de julio de 2012
    ComentarThe institutions certified cover 75% of the sector in terms of assets and members. This value is expected to reach 90% by the endof 2012. Because of changes in the law, 210 institutions are no longer required to obtain certification as they are below thelegal threshold.
  • Procedures for liquidation of identified unviable entities initiated by the governmentValorAbout 25-30 entities expected to be liquidated/ me12 entities merged and 4 liquidated.Identified entities either liquidated or in the pr
    Fecha9 de diciembre de 200428 de junio de 201231 de julio de 2012
    ComentarWork is expected to accelerate, due to the Law deadline to request certification by December 2012, but whether this objective willbe achieved will depend on whether this deadline set by the law will be enforced.
  • Deposit Protection Fund established for the SCI sectorValorNo deposit protection fund exists for the SCI sectThere are twoprotection funds: onefor cooperativA deposit protection fund established with "seed"
    Fecha9 de diciembre de 200428 de junio de 201231 de diciembre de 2009
    Comentar
  • Technology platform being funded under the project through BANSEEFI is embraced by about 100 SCI entitiesValorSome form of platform is available in very few, la372At least 45% market penetration is achieved: about
    Fecha9 de diciembre de 200428 de junio de 201231 de julio de 2012
    ComentarThis number includes all entities that use the platform for distribution ofgovernment transfers,remittancesandcorrespondentbanking. About 90 institutions have adopted the Core Banking while the other institutions (282) use variouselements, including La@Redde la Gente or the Oportunidades program.
  • The auxiliary supervision process carried out by the Supervision Committees, and overseen by CNBV, are satisfactoryValorUnder the Phase I, some Supervision Committes haveSupervision Committees and CNBV functioning effic
    Fecha9 de diciembre de 20047 de febrero de 201131 de diciembre de 2009
    ComentarWith the new cooperative law, one expects to see a restructuring of the supervision structure. While some existing committees maydisintegrate, new ones at the regional level will be formed. The training and capacity building of the supervisory cadre under theproject will continue to benefit the sector.
  • The sector membership in the cooperative entities increases from 4 million to about 9 million.ValorAt start of this project, the membership was aboutMembership of the sector is about 10.1 millionThe sector has about 9 million members by December
    Fecha1 de junio de 200428 de junio de 201231 de diciembre de 2009
    ComentarThis number includes 8.6 million members of SCIs + 1.5 million Bansefi but does not include some 9.5 Oportunidades beneficiaries.
  • Volume of Bank Support: Institutional Development - MicrofinanceValor0.00180000000.00177400000.00
    Fecha30 de junio de 201231 de julio de 2012
    ComentarBased on the retrofitting exercise for core indicators
  • Volume of Bank Support: Enabling Environment - MicrofinanceValor0.0045000000.0045000000.00
    Fecha30 de junio de 201231 de julio de 2012
    ComentarBased on the retrofitting exercise for core indicators

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Documentation for certification (or recommendation for liquidation) prepared for the participating entities and submitted to CNBVValorNo documentation existed as this is required underDocumentation for certification prepared for all pDocumentation relating to all entities completed a
    Fecha9 de diciembre de 200430 de junio de 201231 de julio de 2012
    Comentar
  • Technology platform developed under the project tested, validated, and endorsed by the SCI sector entitiesValorThere is no integrated technology platform in any Technology platformhas been rolled outnationallyThe technology platform is rolled out nationally t
    Fecha9 de diciembre de 200428 de junio de 201231 de julio de 2012
    Comentar