The program has the following components and activities throughout both phases: Component 1 will finance: (i) the rehabilitation or reconstruction of priority bridges and culverts on the national road network to improve the bridge resilience to withstand futurenatural disasters and climate change. Rehabilitation includes replacement in-situ of the existing bridges’ deteriorated parts, and structures. Rehabilitation also includes the upgrade or retrofit...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

(a) to enhance resilience to climate change and natural hazards of Albania’s critical bridge infrastructure and (b) to improve road and bridge asset management.

Llave Detalles

Proyecto Detalles

  • P174595

  • Active

  • Jan Nora

  • Republic of Albania

  • Albania

  • 22 de abril de 2021

  • (a partir de la presentación ante el Directorio)

    16 de marzo de 2023

  • 1 de diciembre de 2023

  • US$ 55.00 millones

  • Albanian Road Authority

  • Europa y Asia central

  • 2023

  • US$ 55.00 millones

  • N/A

  • 20 de diciembre de 2023

  • 31 de julio de 2029

  • Yes

  • BANK APPROVED

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
International Bank for Reconstruction and Development 55.00

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF 55.00
Compromiso de la AIF No Disponible
Compromiso del BIRF + AIF 55.00
Instrumento de Financiamiento
Monto a título de donación No Disponible
Costo total del proyecto** 55.00

Resumen del financiamiento del Banco Mundial (millones de US$) al 28 de febrero de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 28 de febrero de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Project Management Moderately Satisfactory 2025-03-13
Procurement Moderately Satisfactory 2025-03-13
Progress towards achievement of PDO Satisfactory 2025-03-13
Financial Management Satisfactory 2025-03-13
Monitoring and Evaluation Satisfactory 2025-03-13
Overall Implementation Progress (IP) Moderately Satisfactory 2025-03-13

CALIFICACIONES DE LA TERMINACIÓN

No hay datos disponibles.

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

No hay datos disponibles.

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Bridges rehabilitated, reconstructed, or constructed following international guidelines on resilience to climate and natural disastersValor0.000.0030.00
    Fecha31 de marzo de 202320 de diciembre de 202331 de marzo de 2031
    Comentar
  • RAMS/BMS and remote sensing data used for a bridge management and maintenance medium-term budget planningValorRAMS/BMS and remote sensing data not in useRAMS/BMS and remote sensing data not in useRAMS/BMS and remote sensing data used for a trial
    Fecha31 de marzo de 202320 de diciembre de 202330 de marzo de 2029
    Comentar
  • People with enhanced access to transportation servicesValor0.000.00350000.00
    Fecha31 de marzo de 202320 de diciembre de 202331 de marzo de 2031
    Comentar
  • Direct daily road users benefited by rehabilitated, reconstructed, or constructed bridgesValor0.000.00200000.00
    Fecha31 de marzo de 202320 de diciembre de 202331 de marzo de 2031
    Comentar
  • Pedestrians benefited by safer designs from the rehabilitated or reconstructed bridgesValor0.000.00150000.00
    Fecha31 de marzo de 202320 de diciembre de 202331 de marzo de 2031
    Comentar

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Bridge designs completed following international guidelines on resilience to climate and natural hazardsValor0.002.0015.00
    Fecha31 de marzo de 202314 de diciembre de 202330 de marzo de 2029
    Comentar
  • Bridges for which designs have been audited for climate resilience before constructionValor0.0013.33100.00
    Fecha31 de marzo de 202314 de diciembre de 202330 de marzo de 2029
    Comentar
  • The ARA Staff trained for the procurement and implementation of bridge operationsValor0.000.0030.00
    Fecha31 de marzo de 202314 de diciembre de 202330 de marzo de 2029
    Comentar
  • Female last-year university students and graduates recruited for a 6-month paid internship program at the MoIE in the areas of engineering/similar male-dominated fieldsValor0.000.0015.00
    Fecha31 de marzo de 202320 de diciembre de 202330 de marzo de 2029
    Comentar
  • Grievance Redress Mechanism complaints addressed and closed outValor0.000.00100.00
    Fecha20 de diciembre de 202331 de mayo de 202330 de marzo de 2029
    Comentar
  • Service Level Requirements designedValorNoNoYes
    Fecha31 de marzo de 202320 de diciembre de 202330 de marzo de 2029
    Comentar
  • Bridge designs which have been publicly consulted and surveyedValor0.000.00100.00
    Fecha31 de marzo de 202331 de mayo de 202330 de marzo de 2029
    Comentar
  • Bridges for which designs have been audited for Road Safety, ensuring road safety considerations for vulnerable usersValor0.000.00100.00
    Fecha31 de marzo de 202314 de diciembre de 202330 de marzo de 2029
    Comentar
  • Road condition data inputted into the RAMS/BMS in a reliable and systematic manner.Valor0.000.001000.00
    Fecha31 de marzo de 202314 de diciembre de 202330 de marzo de 2029
    Comentar
  • Females employed permanently in the ARA in roles that are male dominated, e.g. engineers, technical planners in the Road Asset Management System, etc.Valor0.000.003.00
    Fecha31 de marzo de 202320 de diciembre de 202330 de marzo de 2029
    Comentar
  • Bridges for which citizen comments and requests have been incorporated in their designsValor0.000.0050.00
    Fecha31 de marzo de 202331 de mayo de 202330 de marzo de 2029
    Comentar
  • Data collected for establishing a Disaster Loss DatabaseValorNoNoYes
    Fecha31 de marzo de 202314 de diciembre de 202330 de marzo de 2029