Improving Resilience and Emergency Response Project

Resumen*

The development objective of Improving Resilience and Emergency Response Project for Romania is to enhance the resilience of Romanian Police Facilities that are critical to respond to Emergency Situations and disasters and to strengthen the institutional capacities for emergency preparedness and response. This project has three components. 1) The first component, Enhance the Resilience of Selected Romanian Police Infrastructure to be Used in Disaster...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

The proposed Project Development Objective (PDO) is to enhance the resilience of Romanian Police Facilities that are critical to respond to Emergency Situations and disasters and to strengthen the institutional capacities for emergency preparedness and response.

Llave Detalles

Proyecto Detalles

  • P168119

  • Active

  • Tuo Shi , Guillermo Siercke

  • Romania (through its Ministry of Public Finance)

  • Rumania

  • 25 de octubre de 2018

  • (a partir de la presentación ante el Directorio)

    29 de mayo de 2019

  • 8 de julio de 2020

  • US$ 57.00 millones

  • Ministry of Internal Affairs (General Inspectorate of Romanian Police)

  • Europa y Asia central

  • 2019

  • US$ 57.00 millones

  • B

  • 13 de noviembre de 2023

  • 31 de diciembre de 2026

  • No

  • BANK APPROVED

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
International Bank for Reconstruction and Development 57.00

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF 57.00
Compromiso de la AIF No Disponible
Compromiso del BIRF + AIF 57.00
Instrumento de Financiamiento
Monto a título de donación No Disponible
Costo total del proyecto** 57.00

Resumen del financiamiento del Banco Mundial (millones de US$) al 28 de febrero de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 28 de febrero de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Procurement Moderately Satisfactory 2024-11-20
Monitoring and Evaluation Satisfactory 2024-11-20
Overall Implementation Progress (IP) Moderately Satisfactory 2024-11-20
Progress towards achievement of PDO Moderately Satisfactory 2024-11-20
Financial Management Satisfactory 2024-11-20
Project Management Moderately Satisfactory 2024-11-20

CALIFICACIONES DE LA TERMINACIÓN

No hay datos disponibles.

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

No hay datos disponibles.

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Police personnel with access to resilient emergency response buildingsValor0.000.003160.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Direct project beneficiaries served by Police personnel in resilient emergency response buildingsValor0.000.003452600.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Capacity to reduce vulnerability of emergency response infrastructure in the long term enhancedValorNo existing strategyNo existing strategyStrategy adopted
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Share of trained Police personnel with newly acquired skills and emergency response equipment participating in operational interventionsValor0.000.00100.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Of which femaleValor0.000.0020.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Technical designs completedValor0.005.0037.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Police personnel with access to new emergency response equipmentValor0.000.00855.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Institutional capacity in place for project implementationValorNoYesYes
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Emergency response buildings which have been reconstructed with enhanced resilienceValor0.000.0010.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Police personnel who have received training in emergency responseValor0.000.00200.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Grievances responded to within stipulated timeValor0.000.00100.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Emergency response buildings which have been retrofitted to enhance resilienceValor0.000.0017.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Communities reached through informative community meetingsValor0.004.0015.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Reconstructed or retrofitted emergency response buildings which have added or enhanced gender responsive design featuresValor0.000.00100.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar
  • Reconstructed or retrofitted emergency response buildings which have design features for universal accessValor0.000.0030.00
    Fecha25 de abril de 201930 de octubre de 202325 de abril de 2025
    Comentar