IDA Partial Credit Guarantee for Dasu Hydropower Phase-I Project

Resumen*

The objective of the Dasu Hydropower Stage I Project (DHP-1) for Pakistan is to facilitate the expansion of electricity supply of hydropower in Pakistan. The Project will also improve access to socio-economic services for local communities in the project area and build the Water and Power Development Authority’s (WAPDA’s) capacity to prepare future hydropower projects. This will be achieved by installing a 2,160 MW hydropower plant on the main Indus...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

The proposed Project would support the Government of Pakistan's efforts to (a) facilitate the expansion of electricity supply of hydro-power in Pakistan; (b) improve access to socio-economic services for local communities in the project area; and (c) build Water and Power Development Authority's (WAPDA) capacity to develop Pakistan's vast hydropower potential. The project would support: (a) construction of a main structure on the Indus River; (b) construction of two power tunnels, a power house and installation of turbines and generators of 2,160 MW installed capacity to generate over 12,000 GWh of annual clean energy; (c) preparatory work such as access roads, offices etc. ; (d) construction of a transmission line for evacuation of power; (e) implementation of social and environmental management plans, monitoring of the river, floods, and sediment; (f) construction supervision, monitoring and evaluation of the Project; and (g) project management support and capacity building of WAPDA.Based on the financing strategy for Dasu HPP, a first IDA credit of US$576.6 million (SDRs 371.9 million equivalent) is proposed for project start up and an IDA partial Credit Guarantee (PCG) of US$460 million from IDA16. In addition to the IDA Credit of US$576.6 million, an IDA Partial Credit Guarantee (PCG) of US$460 million, approval of which is being sought from the Board, would be used for extending the maturity of commercial loan for the civil works contracts. This PCG would cover Component A (US$1,479.7 million) and Component B (US$1,397.8 million).Conditions and covenants for IDA Partial Credit Guarantee for commercial financing would be agreed with WAPDA when the guarantee related agreements are finalized with financiers.The proposed Project would support the Government of Pakistan's efforts to (a) facilitate the expansion of electricity supply of hydro-power in Pakistan; (b) improve access to socio-economic services for local communities in the project area; and (c) build Water and Power Development Authority's (WAPDA) capacity to develop Pakistan's vast hydropower potential. The project would support: (a) construction of a main structure on the Indus River; (b) construction of two power tunnels, a power house and installation of turbines and generators of 2,160 MW installed capacity to generate over 12,000 GWh of annual clean energy; (c) preparatory work such as access roads, offices etc. ; (d) construction of a transmission line for evacuation of power; (e) implementation of social and environmental management plans, monitoring of the river, floods, and sediment; (f) construction supervision, monitoring and evaluation of the Project; and (g) project management support and capacity building of WAPDA.Based on the financing strategy for Dasu HPP, a first IDA credit of US$576.6 million (SDRs 371.9 million equivalent) is proposed for project start up and an IDA partial Credit Guarantee (PCG) of US$460 million from IDA16. In addition to the IDA Credit of US$576.6 million, an IDA Partial Credit Guarantee (PCG) of US$460 million, approval of which is being sought from the Board, would be used for extending the maturity of commercial loan for the civil works contracts. This PCG would cover Component A (US$1,479.7 million) and Component B (US$1,397.8 million).Conditions and covenants for IDA Partial Credit Guarantee for commercial financing would be agreed with WAPDA when the guarantee related agreements are finalized with financiers.

Llave Detalles

Proyecto Detalles

  • P150756

  • Closed

  • Mats Liden

  • N/A

  • Pakistán

  • 10 de junio de 2014

  • (a partir de la presentación ante el Directorio)

    10 de junio de 2014

  • N/A

  • US$ 460.00 millones

  • N/A

  • Asia meridional

  • 2014

  • US$ 0.00 millones

  • N/A

  • No aplicable

  • 31 de diciembre de 2028

  • BANK APPROVED

  • P121507

  • 14 de abril de 2023

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
IDA Guarantee 460.00

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF No Disponible
Compromiso de la AIF No Disponible
Compromiso del BIRF + AIF No Disponible
Instrumento de Financiamiento
Monto a título de donación No Disponible
Costo total del proyecto** 460.00

Resumen del financiamiento del Banco Mundial (millones de US$) al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

No hay datos disponibles.

CALIFICACIONES DE LA TERMINACIÓN

No hay datos disponibles.

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

No hay datos disponibles.

Marco de resultados

No hay datos disponibles.