Skip to Main Navigation

HIV/AIDS Prevention

Resumen*

The HIV/AIDS prevention Project for Vietnam aims at reducing transmission of HIV/AIDS and to ensure that HIV prevalence remains below .3 percent - this is a key objective of the Government of Vietnam's National HIV/AIDS Strategy. The project has the following three components: Component 1) will provide sub-grants to 18 provinces (An Giang, Bac Giang, Ben Tre, Cao Bang, Dong Nai, Hau Giang, Khanh Hoa, Kien Giang, Lai Chau, Nam Dinh, Nghe An, Son La...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

The specific objective of this project is to support programs designed to halt transmission of HIV/AIDS among vulnerable populations( PLWHA, IDUs, CSWs, and their clients and sexual partners) and between these vulnerable populations and the general population. Key outcome indicators include: ** Percent of vulnerable groups in participating provinces reporting safer injection practices (from an estimated 20% at baseline to 70% at the project end ) ** Percent of vulnerable groups in participating provinces reporting condom use in sexual intercourse (from an estimated 40% at baseline to 80% at project end)

Llave Detalles

Proyecto Detalles

  • P082604

  • Closed

  • Mai Thi Nguyen

  • N/A

  • Viet Nam

  • 27 de enero de 2004

  • (a partir de la presentación ante el Directorio)

    29 de marzo de 2005

  • 17 de octubre de 2005

  • US$ 35.00 millones

  • B

  • No aplicable

  • 31 de diciembre de 2013

  • BANK APPROVED

  • 17 de junio de 2013

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
IDA GRANT FOR HIV/AIDS 35.00
Borrower/Recipient 3.50

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF No Disponible
Compromiso de la AIF 35.00
Compromiso del BIRF + AIF 35.00
Instrumento de Financiamiento
Monto a título de donación No Disponible
Costo total del proyecto** 38.50

Resumen del financiamiento del Banco Mundial (millones de US$) al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Procurement Moderately Satisfactory 2013-12-31
Project Management Satisfactory 2013-12-31
Progress towards achievement of PDO Moderately Satisfactory 2013-12-31
Monitoring and Evaluation Moderately Satisfactory 2013-12-31
Counterpart Funding Satisfactory 2013-12-31
Overall Implementation Progress (IP) Satisfactory 2013-12-31
Financial Management Satisfactory 2013-12-31

CALIFICACIONES DE LA TERMINACIÓN

INDICADORINFORME DE LA TERMINACIÓN DE LA EJECUCIÓN Y DE RESULTADOS: 06-26-2014
ResultadosModerately Satisfactory
Riesgo para los resultados de desarrolloSubstantial
Desempeño del BancoSubstantial
Desempeño del prestatarioModerately Satisfactory
Desempeño del GobiernoSubstantial
Organismo EjecutorModerately Satisfactory

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

INDICADORREVISIÓN DEL ICR: 10-01-2014INFORME DE LA EVALUACIÓN DEL DESEMPEÑO DEL PROYECTO:
Calificación De Los ResultadosModerately Satisfactory N/a
Riesgo Para Los Resultados De DesarrolloSignificantN/a
Desempeño Del BancoModerately SatisfactoryN/a
Desempeño Del PrestatarioModerately SatisfactoryN/a
Desempeño Del GobiernoModerately SatisfactoryN/a
Organismo EjecutorModerately SatisfactoryN/a
Calidad Del IfeSatisfactoryN/a
Calidad De SyeSubstantialN/a

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Percent of vulnerable groups in participating provinces reporting safer injection practices (from 20-70%)Valor20%82.7%70%
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2013
    ComentarIBBS results will be announced by the first quarter of 2014 and it will be reflected in ICR report. Therefore, the indicatorremains the same last year.
  • Percent of vulnerable groups in participating provinces reporting condom use in sexual intercourse (from 40-80%)Valor40%85.2%80%
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2013
    ComentarIBBS results will be announced by the first quarter of 2014 and it will be reflected in ICR report. Therefore, the indicatorremains the same last year.

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • An increased percentage of vulnerable groups (from an estimate 10% at baseline to 80% by project end) are reached by provincial servicesValor10%85%80%
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2013
    ComentarHIV services at provinces included condoms ( free and social marketing), needles and syringes ( free and can be purchased at drugstore) at pharmacies), lubricant and condoms for MSM ( free), VCT, STI. Those activities are available to serve targeted groups.
  • An increased percentage (for an estimated 10% at baseline to 90% at project end) of provinces prepare high quality provincial plansValor10%91%90%
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2013
    Comentar This year is final year so, there is no Provincial Action Plan for 2014 to be evaluated. Therefore, percentage remains unchanged.
  • An increased percentage of provinces (from 0 to 90% at project end) establish adequate M&E systemsValor0100%90%
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2012
    Comentarall 32 project provinces set up and implemented the M&E Unit. Data base on epidemic has set up with additional MSM group.
  • An increased percentage of provinces (from an estimated 10% at baseline to 80% at project end) meet targets specified in provincialplansValor10%85%80%
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2013
    Comentar5/32 provinces transferred harm reduction activities to other projects/national program. therefore, original targets were not met.
  • Increased number of provinces offering Methadone sevices (from an estimated 0 at baseline to 6 by project end)Valor076
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2013
    ComentarThe number of provinces implementing the Methadone program was 7; this surpassed the project target (6 provinces).
  • Increased number of injecting drug users enrolled in Methadone services (from an estimated 0 at baseline to 2000 by project end)Valor021672000
    Fecha29 de abril de 20053 de diciembre de 201331 de diciembre de 2013
    ComentarThe number of patients who have received the Methadone program was over the target. It has reached 2167 patients.