Large-scale Renewable Energy Development Project (Phase 1 = $25M; Phase 2 = $45M)

Resumen*

The Large-Scale Renewable Energy Development GEF Project aims to assist Mexico in developing initial experience in commercially-based grid-connected renewable energy applications by supporting construction of an approximately 101 MW IPP wind farm, while building institutional capacity to value, acquire, and manage such resources on a replicable basis. The global objective is to reduce greenhouse gas emissions by addressing and reducing the barriers...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

The global objective of the project is to reduce greenhouse gas emissions (GHGs) and remove barriers to the development of renewable energy technologies and markets, per the Global Environment Facility Operation Progam 6. To assist Mexico in developing initial experience in commercially-based grid-connected renewable energy applications by supporting construction of an approximately 101 MW IPP wind fram, while building institutional capacity to value, acquire, and manage such resources on a replicable basis.

Llave Detalles

Proyecto Detalles

  • P077717

  • Closed

  • Guillermo Hernandez Gonzalez

  • Ministry of Finance (SHCP)

  • México

  • 2 de junio de 2003

  • (a partir de la presentación ante el Directorio)

    29 de junio de 2006

  • 18 de abril de 2007

  • US$ 25.00 millones

  • B

  • No aplicable

  • 30 de abril de 2016

  • BANK APPROVED

  • 30 de agosto de 2024

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
Borrower/Recipient 5.00
Foreign Private Commercial Sources (unidentified) 85.00
Local Sources of Borrowing Country 35.00
Global Environment Facility (GEF) 25.00

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF No Disponible
Compromiso de la AIF No Disponible
Compromiso del BIRF + AIF No Disponible
Instrumento de Financiamiento
Monto a título de donación 25.00
Costo total del proyecto** 150.00

Resumen del financiamiento del Banco Mundial (millones de US$) al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Project Management Satisfactory 2016-04-29
Monitoring and Evaluation Satisfactory 2016-04-29
Summary Global Objective Rating Satisfactory 2016-04-29
Counterpart Funding Satisfactory 2016-04-29
Overall Implementation Progress (IP) Satisfactory 2016-04-29
Overall Safeguards Rating Satisfactory 2016-04-29
Financial Management Moderately Satisfactory 2016-04-29
Procurement Moderately Satisfactory 2016-04-29
Overall Safeguards Rating Satisfactory 2016-04-29

CALIFICACIONES DE LA TERMINACIÓN

INDICADORINFORME DE LA TERMINACIÓN DE LA EJECUCIÓN Y DE RESULTADOS: 10-31-2016
ResultadosSubstantial
Riesgo para los resultados de desarrolloNegligible
Desempeño del BancoSubstantial
Desempeño del prestatarioSubstantial
Desempeño del GobiernoSubstantial
Organismo EjecutorSubstantial

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

INDICADORREVISIÓN DEL ICR: 01-30-2017INFORME DE LA EVALUACIÓN DEL DESEMPEÑO DEL PROYECTO:
Calificación De Los ResultadosSatisfactory N/a
Riesgo Para Los Resultados De DesarrolloModestN/a
Desempeño Del BancoSatisfactoryN/a
Desempeño Del PrestatarioSatisfactoryN/a
Desempeño Del GobiernoSatisfactoryN/a
Organismo EjecutorSatisfactoryN/a
Calidad Del IfeSubstantialN/a
Calidad De SyeModestN/a

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Funds disbursed to ejidos, indigenous communities, and small landowners.ValorNoneMXN 11.884 million paid in 2015Funds disbursed to ejidatarios, indigenous communi
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Significant avian/bat mortality is avoided.ValorNoneIn progressAvian/bat mortality is within acceptable ranges.
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • CFE purchase tariff proposed for Phase II which reflects SRMC plus RE capacity value and energy portfolio diversification value.ValorNoneN/ACFE purchase tariff proposed for Phase II which re
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • CFE purchase price tariff proposed for Phase II which requires reduced GEF subsidy from Phase I.ValorNoneN/ACFE purchase price tariff proposed for Phase II wh
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Least-cost methodology for calculation of renewable energy procurement reflecting System Marginal Cost developed.ValorNoneAchievedLeast-cost methodology for calculation of renewabl
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Planning and dispatch model installed and used in CFE to incorporate intermittent sources.ValorNonePartially achievedInstalled and used
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Strategic Environmental Assessment is developed and accepted as basis permitting scale-up of wind energy in Oaxaca region.ValorNoneAchievedStrategic Environmental Assessment completed and d
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Publishing of new intermittent energy connection contract by CRE including RE capacity recognition.ValorNoneAchievedNew intermittent energy connection contract includ
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Generation Capacity of Renewable Energy (other than hydropower) constructedValor0.00102.85100.00
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Functioning mechanism for the auctioning of tariff subsidy support through competitive bidding established, with incremental tariffsupport provided by GEF.ValorNoneAchievedMechanism is in place and functioning
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Operational Manual for the auctioning mechanism finalized with CFE sign-off, and adopted by CFE.ValorNoneN/AOperational manual adopted
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Regional Environmental Assessment is completed and made available for the La Venta III bidding package.ValorNonePartially AchievedRegional Environmental Assessment completed
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • CFE base solicitation allowing for locations other than the currently identified for La Venta III, including those that would require a change in transmission lines.ValorNoneAchievedAuthorization to change location included in the b
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Number of qualified bids received from tender.ValorNoneAchievedAt least three qualified bids received
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • IPP solicitation for at least 70 MW of wind power.ValorNoneAchievedIPP solicitation for at least 70 MW of wind power.
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Only those bids proposing development in sites identified as environmentally suitable for development are accepted as eligible.ValorNoneAchievedOnly those bids proposing development in sites ide
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Co-financing provided by private entities and export credit agencies by way of capital investments.ValorNoneAchievedCo-financing provided by private entities and expo
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Mechanism for payments to ejidos, indigenous communities, and small landowners, with established process through which landowners or ejidos can verify revenue and requisite payments.ValorNoneAchievedMechanism for payments to ejidatarios, indigenous
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Strengthening of SENER IPU business development services addressing marketing, permitting issues, financing, facilitation, and business advisory services to sponsors of renewable energy projectsValorNonePartially achievedUPI's business development services judged adequat
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Institutional capacity sufficient to issue and manage tenders for additional wind farms/other RE resources.ValorNoneAchievedAssessed as adequate
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Increase electricity supply to national system from renewable energy sources, over baseline. (GWh/yr)Valor7.36287.835 GWh from January to December 2015 (revised270.3 GWh annually (257.5 min)
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Increase total installed renewable capacity, over baseline (MW).Valor2 wind farms102.85 MW101 MW (expected operations)
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Emissions reduced (tons/year), over baseline (CO2, NOx, SOx, and particulates).Valor0177,595 tCO2e from January to December 2015.166,769 tons per year of operation
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Barrier Removal results described below under PDO.ValorBaseline values described in PADBarriers greatly reducedBarriers removed
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Established CFE system short-run marginal cost-based Reference Price combined with agreed maximum U.S. 1.1 cent GEF tariff support sufficient to attract bids, investment, construction and operationValorNoneSystem establishedSystem established
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Subsequent POISE include plans for additional wind IPP procurement at higher reference price and/or lower incentive support level (subject to availability of subsidy funds - GEF or other).ValorNone8POISE includes > 1
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar
  • Generation Capacity of Renewable Energy constructed – WindValor0.00102.85100.00
    Fecha18 de abril de 200724 de abril de 201630 de abril de 2016
    Comentar