Gaza II Emergency Water Project

Objetivo de desarrollo

1. Improve the provision of adequate water and wastewater services in Gaza 2. Functionally establish the Coastal Municipalities Water Utility (CMWU) as an autonomous well-run modern utility. 3. Strengthen PWA's capacity to assume sector regulatory functions.

Llave Detalles

Proyecto Detalles

  • P065920

  • Closed

  • Zeyad Abu-Hassanein

  • N/A

  • Gaza y Ribera Occidental

  • 13 de julio de 2000

  • (a partir de la presentación ante el Directorio)

    7 de junio de 2005

  • 25 de julio de 2005

  • US$ 20.00 millones

  • B

  • 15 de enero de 2013

  • 31 de enero de 2012

  • BANK APPROVED

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
Special Financing 20.00
Borrower/Recipient 2.90

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF No Disponible
Compromiso de la AIF No Disponible
Compromiso del BIRF + AIF No Disponible
Instrumento de Financiamiento
Monto a título de donación 20.00
Costo total del proyecto** 22.90

Resumen del financiamiento del Banco Mundial (millones de US$) al 31 de marzo de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 31 de marzo de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Progress towards achievement of PDO Moderately Satisfactory 2011-12-31
Procurement Moderately Satisfactory 2011-12-31
Counterpart Funding Satisfactory 2011-12-31
Monitoring and Evaluation Satisfactory 2011-12-31
Overall Implementation Progress (IP) Moderately Satisfactory 2011-12-31
Project Management Moderately Satisfactory 2011-12-31
Overall High 2011-12-31
Overall Safeguards Rating Satisfactory 2011-12-31
Financial Management Moderately Satisfactory 2011-12-31

CALIFICACIONES DE LA TERMINACIÓN

INDICADORINFORME DE LA TERMINACIÓN DE LA EJECUCIÓN Y DE RESULTADOS: 08-30-2012
ResultadosModerately Satisfactory
Riesgo para los resultados de desarrolloHigh
Desempeño del BancoModerately Satisfactory
Desempeño del prestatarioModerately Satisfactory
Desempeño del GobiernoModerately Satisfactory
Organismo EjecutorModerately Satisfactory

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

INDICADORREVISIÓN DEL ICR: 09-30-2013INFORME DE LA EVALUACIÓN DEL DESEMPEÑO DEL PROYECTO:
Calificación De Los ResultadosUnsatisfactory N/a
Riesgo Para Los Resultados De DesarrolloHighN/a
Desempeño Del BancoModerately SatisfactoryN/a
Desempeño Del PrestatarioModerately UnsatisfactoryN/a
Desempeño Del GobiernoModerately UnsatisfactoryN/a
Organismo EjecutorModerately UnsatisfactoryN/a
Calidad Del IfeSatisfactoryN/a
Calidad De SyeModestN/a

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Service consistently meeting standards: Drinking water delivery meets the quality and quantity standards.ValorDrinking Water in the network is 99% disinfected.Drinking Water in the network is 99.8% disinfectedDrinking Water in the network is 99.8% disinfected
    Fecha31 de julio de 20056 de diciembre de 201131 de enero de 2012
    Comentar
  • CMWU fully functional and operational: Sets clear objectives and monitors the performance of its services through action plans on investment needs and priorities.ValorThe CMWU does not exist physically.Autonomous fully functioning utility existsAutonomous fully functioning utility exists
    Fecha31 de julio de 20056 de diciembre de 201131 de enero de 2012
    ComentarThe political environment in Gaza is impeding consolidation of other municipalities
  • Capacity of PWA strengthened: PWA monitors water abstraction, groundwater and wastewater qualities on a regular and comprehensive basis and publishes periodic reports about compliance with the standarValorPWA has its mandate and organizational chart to fuN/APWA will be able to assume its responsibilities as
    Fecha31 de julio de 20056 de diciembre de 201131 de enero de 2012
    ComentarAFI, AFII, and AFIII do not have any funds allocated to the corresponding component since the confiscation of PWA officesN/A

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Water wells operational timeValor88%.90%90% of the time.
    Fecha31 de julio de 20056 de diciembre de 201131 de diciembre de 2009
    Comentar
  • volume of water billed to volume of water produced from all available sourcesValor62%.62%70%
    Fecha31 de julio de 20056 de diciembre de 201031 de diciembre de 2009
    Comentar
  • Number of hours all customers receive water each day.Valor6 hrs.6-8 hrs.8 hours
    Fecha31 de julio de 20056 de diciembre de 201131 de enero de 2012
    Comentarthe power deficit in Gaza is the constraint. Customers are adapting to less hours by having in-house storage capacity to ensurecontinuous access
  • Wastewater effluent quality meets agreed standardsValorNot determined.above target using the originally set formula85%
    Fecha31 de julio de 20056 de diciembre de 201131 de enero de 2012
    Comentarmajor infrastructure investments are ongoing to improve WWTP in different governorates
  • Improvements to annual gross revenue collectionValor40%35-55% in different municipalities50%
    Fecha31 de julio de 20056 de diciembre de 201131 de enero de 2012
    ComentarCMWU conducted sucessful campaigns to improve collection. Yet collection is low due to prevailing poverty and unemployment