Skip to Main Navigation

Ho Chi Minh City Environmental Sanitation (Nhieu Loc-Thi Nghe Basin) Project

Resumen*

The Ho Chi Minh City Environmental Sanitation Project will lead to sustainable improvements in public health, and the well-being of the city's population, through improved reductions in wastewater pollution, and in flood occurrences, as a result of institutional efficiency in the management of drainage, and wastewater services. The two components are: 1) Construction of the Nghie Loc Thi Nghe wastewater interceptor, to divert dry weather wastewater...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

Reduce the incidence of flooding and increase the collection of wastewater in the Nhieu Loc Thi Nghe (NLTN) Basin in HCMC, in an environmentally and financially sustainable manner.

Llave Detalles

Proyecto Detalles

  • P052037

  • Closed

  • Dean Cira

  • N/A

  • Viet Nam

  • 4 de enero de 2000

  • (a partir de la presentación ante el Directorio)

    20 de marzo de 2001

  • 3 de febrero de 2002

  • US$ 166.34 millones

  • A

  • No aplicable

  • 30 de junio de 2012

  • BANK APPROVED

  • 15 de enero de 2013

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
IDA Credit 166.34
Borrower/Recipient 33.62

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF No Disponible
Compromiso de la AIF 166.34
Compromiso del BIRF + AIF 166.34
Instrumento de Financiamiento
Monto a título de donación No Disponible
Costo total del proyecto** 199.96

Resumen del financiamiento del Banco Mundial (millones de US$) al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Counterpart Funding Satisfactory 2012-07-08
Progress towards achievement of PDO Moderately Satisfactory 2012-07-08
Financial Management Moderately Satisfactory 2012-07-08
Monitoring and Evaluation Moderately Satisfactory 2012-07-08
Procurement Moderately Satisfactory 2012-07-08
Project Management Moderately Satisfactory 2012-07-08
Overall Implementation Progress (IP) Moderately Satisfactory 2012-07-08

CALIFICACIONES DE LA TERMINACIÓN

INDICADORINFORME DE LA TERMINACIÓN DE LA EJECUCIÓN Y DE RESULTADOS: 12-30-2012
ResultadosModerately Satisfactory
Riesgo para los resultados de desarrolloModest
Desempeño del BancoModerately Satisfactory
Desempeño del prestatarioModerately Satisfactory
Desempeño del GobiernoModerately Unsatisfactory
Organismo EjecutorModerately Satisfactory

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

INDICADORREVISIÓN DEL ICR: 08-19-2013INFORME DE LA EVALUACIÓN DEL DESEMPEÑO DEL PROYECTO:
Calificación De Los ResultadosModerately Satisfactory N/a
Riesgo Para Los Resultados De DesarrolloSignificantN/a
Desempeño Del BancoModerately SatisfactoryN/a
Desempeño Del PrestatarioModerately SatisfactoryN/a
Desempeño Del GobiernoModerately UnsatisfactoryN/a
Organismo EjecutorModerately SatisfactoryN/a
Calidad Del IfeUnsatisfactoryN/a
Calidad De SyeModestN/a

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Reduction in the number of households affected by two year return period stormValor0.0096000.0096000.00
    Fecha1 de enero de 200719 de junio de 20121 de junio de 2012
    ComentarChanged during restructuringData from the Steering Committee for Flood Control indicates reduced flooding in the NLTN catchment area since 2007, despiteincreased rainfall. Over 1.2 million people benefit from the reduced flooding, and thus the target of 96000 households has beenexceeded.This target has been reached or exceeded based on the overall population of the catchment area.
  • Increase in the number of households whose wastewater is collected and disposed of safelyValor0.00200000.00240000.00
    Fecha1 de enero de 200719 de junio de 201230 de junio de 2012
    ComentarChanged during restructuringEstimate is based on actual works progress to date. Actual numbers will be assessed only after the project closing when thesurveyof level three and four sewers is completed.This is expected to have been reached, but the actual survey will only be completed after project closes. and the survey iscompleted.
  • Improvement in the water quality of the NLTN Canal measured by the average level of dissolved oxygen (DO)Valor0.052.004.00
    Fecha4 de enero de 201031 de mayo de 201230 de junio de 2012
    ComentarTaken at low tideLow tide average in the NLTN canal was 2.0, already much improved from the baseline. Though this is less than the target value,itshows strong improvement over the baseline. Once operational, this should improve further.Target is a value of at least 4 measured as Mg/l. Water quality is already much improved from the baseline samples. The resultsindicate the dredging is serving to improve water quality. Once the interceptor is commissioned the water quality is expected toimprove further. The ICR will include further water quality monitoring results.
  • Implementation of the agreed tariif schedule by the People's Committee of Ho Chi Minh CityValor250.00450.00450.00
    Fecha1 de enero de 200726 de octubre de 20111 de junio de 2012
    ComentarValue is Vietnam Dong (VND) per cubic meterChanged during restructuringBased on the approved tariff decreesThe actual tariff is now higher than the target of VND450 as the water tariff has continued to increase. The road map to 2015expects to increase the waste water tariff the 15% of the water tariff by 2015.

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • KM of wastewater interceptor constructedValor5.009.008.40
    Fecha11 de enero de 200720 de junio de 20121 de junio de 2012
    ComentarThe interceptor has been 100% completed.100% complete.
  • KM of combined primary and secondary sewers replaced and constructed.Valor2.0052.0059.50
    Fecha11 de enero de 200720 de junio de 20121 de junio de 2012
    ComentarAdded as part of 2009 restructuring.Final amount is less than earlier projection due to design change. But Target is considered met.Target met as of final mission.
  • KM of sheet piles installed for canal embankmentsValor1.0016.3018.00
    Fecha11 de enero de 200720 de junio de 20121 de junio de 2012
    ComentarAdded at restructuring in 2009.The canal improve was complete at time of last mission. Design changes resulted in fewer KM of piles required.Target met
  • Cubic Meters of sludge and excavated material dredeged.Valor0.00946069.001029000.00
    Fecha11 de enero de 200713 de junio de 20121 de junio de 2012
    ComentarAdded as part of restructuring in 2009Independent hydrographic survey confirmed this amount.Target met as of last mission. Some minor dredging is still required at certain bridges.