Adaptation to Climate Change Impacts on the Coastal Wetlands in the Gulf of Mexico

Resumen*

The objective of the Adaptation to Climate Change in the Coastal Wetlands in the Gulf of Mexico Project is to promote adaptation to the consequences of climate impacts in the coastal wetlands of the Gulf of Mexico, through the implementation of pilot measures that will provide information about the costs and benefits of alternative approaches to reduce the vulnerability of said coasts to climate change. There are four components to the project, the...

* El resumen del proyecto es elaborado sobre la base del documento de evaluación inicial, el informe de evaluación inicial preparado por el personal o el documento del programa y es posible que no refleje exactamente la índole actual del proyecto.

Ver Más

Objetivo de desarrollo

The objective of the project is to promote adaptation to the consequences of climate impacts in the coastal wetlands of the Gulf of Mexico, through the implementation of pilot measures that would provide information on the costs and benefits of alternative approaches to reduce their vulnerability. The project also seeks to assess the overall impacts of climate change on national water resource planning, including the identification of potential response options, with a focus on coastal wetlands and associated watersheds. The experience from the project pilots is intended to inform the government's future adaptation strategy and development programs in the Gulf region.

Llave Detalles

Proyecto Detalles

  • P100438

  • Closed

  • Renan Alberto Poveda

  • Secretaria de Hacienda y Credito Publico (SHCP)

  • México

  • 25 de septiembre de 2007

  • (a partir de la presentación ante el Directorio)

    23 de noviembre de 2010

  • 7 de octubre de 2011

  • US$ 23.50 millones

  • Instituto Nacional de Ecologia y Cambio Climatico (INECC),Mexican Institute of Water Technology (IMTA)

  • América Latina y el Caribe

  • 2011

  • US$ 6.36 millones

  • B

  • No aplicable

  • 31 de octubre de 2016

  • BANK APPROVED

  • 15 de marzo de 2022

  • Notes

Finanzas

Financiamiento (millones de US$)

No hay datos disponibles.
Entidad De Financiamiento Compromisos
Borrower/Recipient 17.14
US, Govt. of 0.77
JAPAN: Gov. of (excl. Ministry of Finance - PHRD Grants) 0.55
Global Environment Facility (GEF) 4.50
JAPAN: Ministry of Finance - PHRD Grants 0.55

Financiamiento total del proyecto (millones de US$)

Línea de productos BIRF/AIF
Compromiso del BIRF No Disponible
Compromiso de la AIF No Disponible
Compromiso del BIRF + AIF No Disponible
Instrumento de Financiamiento
Monto a título de donación 6.36
Costo total del proyecto** 23.50

Resumen del financiamiento del Banco Mundial (millones de US$) al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Entidad De Financiamiento Fecha De Aprobación Fecha De Cierre Principal Desembolsado Reembolsos Intereses Y Cargos

Actividad financiera detallada al 30 de abril de 2025

Exportar:
No hay datos disponibles.
Período Entidad De Financiamiento Tipo De Transacción Monto (US$)

Footnotes

Ratings

CALIFICACIONES DE LA EJECUCIÓN

Name Review Date
Monitoring and Evaluation Satisfactory 2016-11-15
Overall Implementation Progress (IP) Moderately Satisfactory 2016-11-15
Counterpart Funding Satisfactory 2016-11-15
Project Management Moderately Satisfactory 2016-11-15
Summary Global Objective Rating Moderately Satisfactory 2016-11-15
Financial Management Moderately Satisfactory 2016-11-15
Procurement Moderately Satisfactory 2016-11-15
Overall Safeguards Rating Satisfactory 2016-11-15

CALIFICACIONES DE LA TERMINACIÓN

INDICADORINFORME DE LA TERMINACIÓN DE LA EJECUCIÓN Y DE RESULTADOS: 04-30-2017
ResultadosModerately Satisfactory
Riesgo para los resultados de desarrolloModest
Desempeño del BancoModerately Satisfactory
Desempeño del prestatarioModerately Satisfactory
Desempeño del GobiernoModerately Satisfactory
Organismo EjecutorModerately Satisfactory

CALIFICACIONES DE EVALUACIONES INDEPENDIENTES

INDICADORREVISIÓN DEL ICR: 06-28-2017INFORME DE LA EVALUACIÓN DEL DESEMPEÑO DEL PROYECTO:
Calificación De Los ResultadosModerately Satisfactory N/a
Riesgo Para Los Resultados De DesarrolloModestN/a
Desempeño Del BancoModerately SatisfactoryN/a
Desempeño Del PrestatarioModerately SatisfactoryN/a
Desempeño Del GobiernoModerately UnsatisfactoryN/a
Organismo EjecutorModerately SatisfactoryN/a
Calidad Del IfeModestN/a
Calidad De SyeModestN/a

Marco de resultados

INDICADORES DE OBJETIVOS DE DESARROLLO DE PROYECTOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO

INDICADORES DE RESULTADOS INTERMEDIOS

INDICATORLÍNEA DE REFERENCIAEN CURSOOBJETIVO
  • Climate change impact scenarios developed for selected basins and for coastal wetlands supporting knowledge base required to mainstream CC into water resources and wetland management and planning.ValorNo responseoptionsdefined yeton cc impactsin nActivity is 100% completed. IMTA developed a respoAt least onenational waterresourcesmanagementr
    Fecha23 de noviembre de 201029 de diciembre de 201531 de octubre de 2016
    Comentar
  • Component 1: At least 3 pilot adaptation measures with sound technical design documents including analysis of financial, economic, social and environmental aspects are ready for implementationValor0(i) The pilot adaptation measure in Sian Ka'an (coImplemented measures provide results on adaptation
    Fecha23 de noviembre de 201031 de diciembre de 201531 de octubre de 2016
    Comentar
  • Component 3: Climate change impact scenarios developed for national water resources and for coastal wetlands including identification of response optionsValorNational policies do not yet incorporate cc impactThis activity is 100% completed. IMTA has: (i) Climate change impact scenarios for national water
    Fecha23 de noviembre de 201031 de octubre de 201630 de octubre de 2015
    Comentar
  • Component 3: Modeling, generation of data, analysis, and access to information and long-term remote sensingValorLimited monitoring of pilot wetlands, limited moniThis activity is 100% completed. IMTA has: (i) eModeling, generation of data, analysis, and access
    Fecha23 de noviembre de 201029 de diciembre de 201531 de octubre de 2016
    Comentar
  • Component 1. Pilot adaptation measures will include a Sustainability StrategyValorNo adaptation pilotsSustainability strategy in the design of pilot adaPilot adaptation measures will include a sustainab
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Component 2. Papaloapan: • Alvarado Municipality under land use planning incorporating CC impacts as well as adaptation and conservation measures.ValorConservation management plans do not take CC impacTwo land use plans and a revised protected area mgLand use planning of Alvarado Lagoon submitted for
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Tabasco: Land use planning updated incorporating CC impacts as well as adaptation and conservatino measures.ValorDeforestation and land conversion are frequent. LaActivity 100% completed. The local land use planniLand use planning of Tabasco updated with CC consi
    Fecha30 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Component 4: Established process for articulation and coordination among the agencies involved.ValorLack of articulation among agencies involved leadiProject management has improved during the last peFinal evaluation finds the project management sati
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Papaloapan: Strengthening capacities for adaptation to CC in at least one location.ValorLack of local capacity to address adaptation issueField visits, and a number of workshops undertakenOne awareness rasing capacity building workshop co
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Tabasco: • Infrastructure and equipment (cleaning, desilting and rehabilitation of at least 3 km of water fluxes; one tide gauge and meteorological instruments; and at least two stilt houses and one rValorLack of infrastructure and equipment to adapt to Ca) Development of a system for capturing rainwaterEquipment and infrastructure installed and operati
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Sian Ka'an: Infrastructure and equipment to reduce CC vulnerability installed (one tide gauge, and metereological and oceanographicinstruments).Valorthe SK reserve is lacking equipment and infrastrucThe mareographic and meteorological equipment are infrastructure in place and equipment installed an
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Papaloapan: • Infrastructure and equipment (cleaning, desilting and rehabilitation of at least 3 km of water fluxes; and one tide gauge and meteorological instruments) to reduce vulnerability to CC.ValorLack of adaptation infrastructure or equipment aga100% completion of infrastructure for cleaning watInfrastructure and equipment installed and operati
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Component 1: Two mgt Plans for wildlife conservation, and sustainable utilization units (UMAs) in mangrove ecosystems developedValor0.002.002.00
    Fecha23 de noviembre de 201029 de diciembre de 201531 de octubre de 2016
    Comentar
  • Tabasco: One mgt plan for wildlife conservation and sustainable utilization unit (UMA) in mangrove ecosystem.ValorThere are no mgt plans for wildlife conservation aThe management plan for Wildlife Conservation, ManAt least one UMA established
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Tabasco: Strengthening capacities for adaptation to CC in at least one location.ValorLack of capacity for adaptation in local communitiField visits, and a number of workshops undertakenCapacities for adaptation to CC strengthened in at
    Fecha23 de noviembre de 201029 de diciembre de 201531 de octubre de 2016
    Comentar
  • Sian Ka'an: Protected Area Monitoring System Strengthened to include CC parameters.ValorThe Protected Area Monitoring System does not inclThe monitoring protocol has been developed. The eqMonitoring systems with CC parameters developed fo
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Sian Ka'an: Protected Area Management Program revised to include CC considerations.ValorThe SK mgt plan does not have any CC considerationProtected Area Management Program for the Natural Protected area management program revised to inclu
    Fecha23 de noviembre de 201029 de diciembre de 201531 de octubre de 2016
    Comentar
  • Sian Ka'an: Repopulating genetically diverse temperature-resistant coral genotypes in six areas.ValorCoral reef system in SK degrated and damaged due tSix locations of the Sian Kaán Reserve (comprisingA target of genetically diverse temperature-resist
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Sian Ka'an: Rehabilitation of water fluxes of El Playón mangrove ecosystem for a target of at least 70 ha.ValorThe mangrove ecosystem of El Playon is degraded anRehabilitation of the water-fluxes (100 ha) and 6 Rehabilitation of water fluxes and restoration of
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Sian Ka'an: Strengthening local capacities for adaptation to CC in at least one location.ValorLocal communities lack capacity on how to address Field visits, and a number of workshops undertakenCapacities for adaptation to CC strengthened in at
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Component 2: • Papaloapan - Reforestation of mangrove ecosystem and riparian zones for a target of at least 30 ha.Valora decline in the mangrove and riparian vegetation 100% completed. 25 Ha of mangrove reforestation A target of 30 ha of reforested mangrove and ripar
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Tabasco: Reforestation of mangrove ecosystem and riparian zones for a target of at least 20 ha.ValorHigh deforestation rates in mangrove ecosystems an100% completed. 25 ha of mangroves reforested inReforestation of at least 20 ha reforested and/or
    Fecha30 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Component 4: Reduced time in issuing contracts and administrative processes.ValorContracts take up to 9 months to be approved.All the stakeholders involved in processing contraFinal evaluation finds the project management sati
    Fecha23 de noviembre de 201021 de noviembre de 201231 de octubre de 2016
    Comentar
  • Papaloapan - One management plan for Wildlife Conservation, Management, and Sustainable Utilization Units (UMA) in mangrove ecosystems.Valor0.001.001.00
    Fecha23 de noviembre de 201029 de diciembre de 201531 de octubre de 2016
    Comentar
  • Production and dissemination of practical guidance document on cost and benefits of adaptation measures in coastal wetlands as a basis for replication efforts.ValorThere are no cost-benefit analysis existing on adaA cost-benefit analysis of the mangrove reforestatCost and benefits of adaptation approaches in wetl
    Fecha23 de noviembre de 201031 de octubre de 201731 de octubre de 2016
    Comentar
  • Design documents for pilot adaptation measures that facilitate prompt implementation and include sustainability strategy as well asmonitoring provisionsValor0.003.003.00
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • Two land use plans and a revised protected area management program, incorporating climate change adaptation activities, discussed with stakeholders, and at least one land use planning program submitteValorLimited availability of WMP(exception Sian Kaan);i) Alvarado Lagoon under Land Use Planning ProgramTwo land use plans and a revised protected area mg
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar
  • More than 50 ha of mangrove ecosystem and riparian zones reforested, more than 70 ha of water fluxes rehabilitated in Veracruz and Tabasco, and at least six areas in the Sian Ka’an Biosphere Reserve wValorNo adaptationmeasures inpilot sites(i) Reforestation of mangrove ecosystem completed More than 50 ha of mangrove ecosystem and riparian
    Fecha23 de noviembre de 201031 de octubre de 201631 de octubre de 2016
    Comentar