Entidad De Financiamiento | Compromisos |
---|---|
Borrower/Recipient | 17.14 |
US, Govt. of | 0.77 |
JAPAN: Gov. of (excl. Ministry of Finance - PHRD Grants) | 0.55 |
Global Environment Facility (GEF) | 4.50 |
JAPAN: Ministry of Finance - PHRD Grants | 0.55 |
P100438
Closed
Renan Alberto Poveda
Secretaria de Hacienda y Credito Publico (SHCP)
25 de septiembre de 2007
(a partir de la presentación ante el Directorio)
23 de noviembre de 2010
7 de octubre de 2011
US$ 23.50 millones
Instituto Nacional de Ecologia y Cambio Climatico (INECC),Mexican Institute of Water Technology (IMTA)
2011
US$ 6.36 millones
B
No aplicable
31 de octubre de 2016
BANK APPROVED
15 de marzo de 2022
Entidad De Financiamiento | Compromisos |
---|---|
Borrower/Recipient | 17.14 |
US, Govt. of | 0.77 |
JAPAN: Gov. of (excl. Ministry of Finance - PHRD Grants) | 0.55 |
Global Environment Facility (GEF) | 4.50 |
JAPAN: Ministry of Finance - PHRD Grants | 0.55 |
Línea de productos | BIRF/AIF |
---|---|
Compromiso del BIRF | No Disponible |
Compromiso de la AIF | No Disponible |
Compromiso del BIRF + AIF | No Disponible |
Instrumento de Financiamiento | |
---|---|
Monto a título de donación | 6.36 |
Costo total del proyecto** | 23.50 |
Name | Review | Date |
---|---|---|
Monitoring and Evaluation | Satisfactory | 2016-11-15 |
Overall Implementation Progress (IP) | Moderately Satisfactory | 2016-11-15 |
Counterpart Funding | Satisfactory | 2016-11-15 |
Project Management | Moderately Satisfactory | 2016-11-15 |
Summary Global Objective Rating | Moderately Satisfactory | 2016-11-15 |
Financial Management | Moderately Satisfactory | 2016-11-15 |
Procurement | Moderately Satisfactory | 2016-11-15 |
Overall Safeguards Rating | Satisfactory | 2016-11-15 |
INDICADOR | INFORME DE LA TERMINACIÓN DE LA EJECUCIÓN Y DE RESULTADOS: 04-30-2017 |
---|---|
Resultados | Moderately Satisfactory |
Riesgo para los resultados de desarrollo | Modest |
Desempeño del Banco | Moderately Satisfactory |
Desempeño del prestatario | Moderately Satisfactory |
Desempeño del Gobierno | Moderately Satisfactory |
Organismo Ejecutor | Moderately Satisfactory |
INDICADOR | REVISIÓN DEL ICR: 06-28-2017 | INFORME DE LA EVALUACIÓN DEL DESEMPEÑO DEL PROYECTO: |
---|---|---|
Calificación De Los Resultados | Moderately Satisfactory | N/a |
Riesgo Para Los Resultados De Desarrollo | Modest | N/a |
Desempeño Del Banco | Moderately Satisfactory | N/a |
Desempeño Del Prestatario | Moderately Satisfactory | N/a |
Desempeño Del Gobierno | Moderately Unsatisfactory | N/a |
Organismo Ejecutor | Moderately Satisfactory | N/a |
Calidad Del Ife | Modest | N/a |
Calidad De Sye | Modest | N/a |
INDICATOR | LÍNEA DE REFERENCIA | EN CURSO | OBJETIVO |
---|
INDICATOR | LÍNEA DE REFERENCIA | EN CURSO | OBJETIVO |
---|
Climate change impact scenarios developed for selected basins and for coastal wetlands supporting knowledge base required to mainstream CC into water resources and wetland management and planning. | Valor | No responseoptionsdefined yeton cc impactsin n | Activity is 100% completed. IMTA developed a respo | At least onenational waterresourcesmanagementr |
Fecha | 23 de noviembre de 2010 | 29 de diciembre de 2015 | 31 de octubre de 2016 | |
Comentar |
Component 1: At least 3 pilot adaptation measures with sound technical design documents including analysis of financial, economic, social and environmental aspects are ready for implementation | Valor | 0 | (i) The pilot adaptation measure in Sian Ka'an (co | Implemented measures provide results on adaptation |
Fecha | 23 de noviembre de 2010 | 31 de diciembre de 2015 | 31 de octubre de 2016 | |
Comentar |
Component 3: Climate change impact scenarios developed for national water resources and for coastal wetlands including identification of response options | Valor | National policies do not yet incorporate cc impact | This activity is 100% completed. IMTA has: (i) | Climate change impact scenarios for national water |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 30 de octubre de 2015 | |
Comentar |
Component 3: Modeling, generation of data, analysis, and access to information and long-term remote sensing | Valor | Limited monitoring of pilot wetlands, limited moni | This activity is 100% completed. IMTA has: (i) e | Modeling, generation of data, analysis, and access |
Fecha | 23 de noviembre de 2010 | 29 de diciembre de 2015 | 31 de octubre de 2016 | |
Comentar |
Component 1. Pilot adaptation measures will include a Sustainability Strategy | Valor | No adaptation pilots | Sustainability strategy in the design of pilot ada | Pilot adaptation measures will include a sustainab |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Component 2. Papaloapan: • Alvarado Municipality under land use planning incorporating CC impacts as well as adaptation and conservation measures. | Valor | Conservation management plans do not take CC impac | Two land use plans and a revised protected area mg | Land use planning of Alvarado Lagoon submitted for |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Tabasco: Land use planning updated incorporating CC impacts as well as adaptation and conservatino measures. | Valor | Deforestation and land conversion are frequent. La | Activity 100% completed. The local land use planni | Land use planning of Tabasco updated with CC consi |
Fecha | 30 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Component 4: Established process for articulation and coordination among the agencies involved. | Valor | Lack of articulation among agencies involved leadi | Project management has improved during the last pe | Final evaluation finds the project management sati |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Papaloapan: Strengthening capacities for adaptation to CC in at least one location. | Valor | Lack of local capacity to address adaptation issue | Field visits, and a number of workshops undertaken | One awareness rasing capacity building workshop co |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Tabasco: • Infrastructure and equipment (cleaning, desilting and rehabilitation of at least 3 km of water fluxes; one tide gauge and meteorological instruments; and at least two stilt houses and one r | Valor | Lack of infrastructure and equipment to adapt to C | a) Development of a system for capturing rainwater | Equipment and infrastructure installed and operati |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Sian Ka'an: Infrastructure and equipment to reduce CC vulnerability installed (one tide gauge, and metereological and oceanographicinstruments). | Valor | the SK reserve is lacking equipment and infrastruc | The mareographic and meteorological equipment are | infrastructure in place and equipment installed an |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Papaloapan: • Infrastructure and equipment (cleaning, desilting and rehabilitation of at least 3 km of water fluxes; and one tide gauge and meteorological instruments) to reduce vulnerability to CC. | Valor | Lack of adaptation infrastructure or equipment aga | 100% completion of infrastructure for cleaning wat | Infrastructure and equipment installed and operati |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Component 1: Two mgt Plans for wildlife conservation, and sustainable utilization units (UMAs) in mangrove ecosystems developed | Valor | 0.00 | 2.00 | 2.00 |
Fecha | 23 de noviembre de 2010 | 29 de diciembre de 2015 | 31 de octubre de 2016 | |
Comentar |
Tabasco: One mgt plan for wildlife conservation and sustainable utilization unit (UMA) in mangrove ecosystem. | Valor | There are no mgt plans for wildlife conservation a | The management plan for Wildlife Conservation, Man | At least one UMA established |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Tabasco: Strengthening capacities for adaptation to CC in at least one location. | Valor | Lack of capacity for adaptation in local communiti | Field visits, and a number of workshops undertaken | Capacities for adaptation to CC strengthened in at |
Fecha | 23 de noviembre de 2010 | 29 de diciembre de 2015 | 31 de octubre de 2016 | |
Comentar |
Sian Ka'an: Protected Area Monitoring System Strengthened to include CC parameters. | Valor | The Protected Area Monitoring System does not incl | The monitoring protocol has been developed. The eq | Monitoring systems with CC parameters developed fo |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Sian Ka'an: Protected Area Management Program revised to include CC considerations. | Valor | The SK mgt plan does not have any CC consideration | Protected Area Management Program for the Natural | Protected area management program revised to inclu |
Fecha | 23 de noviembre de 2010 | 29 de diciembre de 2015 | 31 de octubre de 2016 | |
Comentar |
Sian Ka'an: Repopulating genetically diverse temperature-resistant coral genotypes in six areas. | Valor | Coral reef system in SK degrated and damaged due t | Six locations of the Sian Kaán Reserve (comprising | A target of genetically diverse temperature-resist |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Sian Ka'an: Rehabilitation of water fluxes of El Playón mangrove ecosystem for a target of at least 70 ha. | Valor | The mangrove ecosystem of El Playon is degraded an | Rehabilitation of the water-fluxes (100 ha) and 6 | Rehabilitation of water fluxes and restoration of |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Sian Ka'an: Strengthening local capacities for adaptation to CC in at least one location. | Valor | Local communities lack capacity on how to address | Field visits, and a number of workshops undertaken | Capacities for adaptation to CC strengthened in at |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Component 2: • Papaloapan - Reforestation of mangrove ecosystem and riparian zones for a target of at least 30 ha. | Valor | a decline in the mangrove and riparian vegetation | 100% completed. 25 Ha of mangrove reforestation | A target of 30 ha of reforested mangrove and ripar |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Tabasco: Reforestation of mangrove ecosystem and riparian zones for a target of at least 20 ha. | Valor | High deforestation rates in mangrove ecosystems an | 100% completed. 25 ha of mangroves reforested in | Reforestation of at least 20 ha reforested and/or |
Fecha | 30 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Component 4: Reduced time in issuing contracts and administrative processes. | Valor | Contracts take up to 9 months to be approved. | All the stakeholders involved in processing contra | Final evaluation finds the project management sati |
Fecha | 23 de noviembre de 2010 | 21 de noviembre de 2012 | 31 de octubre de 2016 | |
Comentar |
Papaloapan - One management plan for Wildlife Conservation, Management, and Sustainable Utilization Units (UMA) in mangrove ecosystems. | Valor | 0.00 | 1.00 | 1.00 |
Fecha | 23 de noviembre de 2010 | 29 de diciembre de 2015 | 31 de octubre de 2016 | |
Comentar |
Production and dissemination of practical guidance document on cost and benefits of adaptation measures in coastal wetlands as a basis for replication efforts. | Valor | There are no cost-benefit analysis existing on ada | A cost-benefit analysis of the mangrove reforestat | Cost and benefits of adaptation approaches in wetl |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2017 | 31 de octubre de 2016 | |
Comentar |
Design documents for pilot adaptation measures that facilitate prompt implementation and include sustainability strategy as well asmonitoring provisions | Valor | 0.00 | 3.00 | 3.00 |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
Two land use plans and a revised protected area management program, incorporating climate change adaptation activities, discussed with stakeholders, and at least one land use planning program submitte | Valor | Limited availability of WMP(exception Sian Kaan); | i) Alvarado Lagoon under Land Use Planning Program | Two land use plans and a revised protected area mg |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |
More than 50 ha of mangrove ecosystem and riparian zones reforested, more than 70 ha of water fluxes rehabilitated in Veracruz and Tabasco, and at least six areas in the Sian Ka’an Biosphere Reserve w | Valor | No adaptationmeasures inpilot sites | (i) Reforestation of mangrove ecosystem completed | More than 50 ha of mangrove ecosystem and riparian |
Fecha | 23 de noviembre de 2010 | 31 de octubre de 2016 | 31 de octubre de 2016 | |
Comentar |