Proyectos y operaciones

ANUNCIO

Package Supply Of Transformer For Sub - Project: New Construction Of Mai Lam 110kv Ais Substation, Distribution Efficiency Project

DATOS BÁSICOS DEL ANUNCIO

No. de identificación del proyecto P125996
Nombre del Proyecto VN-Distribution Efficiency Project
País Viet Nam
N.° de anuncio OP00027168
Tipo de anuncio Solicitud de Ofertas
Estado del anuncio Revisado
Referencia de la oferta del prestatario DEP-HNPC-ML-G01
Método de adquisiciones Licitación pública internacional
Idioma del anuncio Inglés
Fecha/Hora límite de presentación 18 de junio de 2014  14:00
Fecha de publicación 22 de abril de 2014

INFORMACIÓN DE CONTACTO

Organización/Departamento Hanoi Power Corporation
Nombre Nguyen Thu Hien
Dirección 69 Dinh Tien Hoang, Hoan Kiem District
Ciudad Hanoi
Provincia/Estado Vietnam
Código postal No Disponible
País Vietnam
Teléfono 84-4-22200852
Correo electrónico thuhien281167@yahoo.com
Sitio web No Disponible

 

Invitation for Bids (IFB)

 

The Socialist Republic of Viet Nam

PROJECT: DISTRIBUTION EFFICIENCYPROJECT

 

 

Package DEP-HNPC-ML-G01: SUPPLY OFTRANSFORMER

Sub ? project: New construction ofMai Lam 110kV AIS Substation

 

WB credit: Cr.5156 - VN

IFB No: 584

Date : April 22, 2014

 1.        TheSocialist Republic of Vietnam hasreceived financing from the World Banktoward the cost of the Sub - Project: New construction of Mai Lam 110kV AIS substation of Distribution EfficiencyProject,and intends toapply part of the proceeds toward payments under the contract for Supply oftransformer (DEP-HNPC-ML-G01).

2.         Hanoi Power Corporation now invites sealed bids from eligible bidders for supply of a 63MVA-115/36.5/23kV Power transformer including Remote control cubicle RCP and 02auxiliary transformers: 100kVA-35/0.4kV & 100kVA-22/0.4; Project site: Mai Lam AIS 110kV substation, Dong Anh, Hanoi; Deliverydate: 16 weeks.

3.         Bidding will be conducted through the International Competitive Bidding procedures asspecified in the World Bank's Guidelines: Procurement of Goods, Works and Non-Consulting Servicesunder IBRD Loans and IDA Credits &Grants by World Bank Borrowers, Jannuary 2011 Revision, and is open to all eligible bidders as defined in the Procurement Guidelines. In addition, please refer to paragraphs 1.6and 1.7 setting forth the World Bank's policy on conflict of interest.

4.         Interested eligible bidders may obtainfurther information from Tender Department ? Hanoi Power Corporationand inspect the Bidding Documents during office houres (from 8.00 to 16.30) at the address (1) given below fromMay 05, 2014 to June 18, 2014.

5.         A complete set of Bidding Documents in English may be purchased by interested eligible bidders upon thesubmission of a written application to the address below and upon payment of a nonrefundable fee of VND 2,000,000. The method of payment will be in cash.  The Document may be collected directly atthe address (1) given below. 

6.         Bids must be delivered to the address (1) below on or before14.00 (local time) on June 18,2014. Electronic bidding will not be permitted. Late bids will be rejected. Bids will be publicly opened in the presence of the bidders'designated representatives and anyone who choose to attend at the address (2) below at 14.00 (local time) on June 18, 2014.

The main requirements for the bidder'squalification:

Sound financial performance for the last three (03) years(2010,2011,2012) or (2011,2012,2013).

Average annual turnover within the last three(03) years shall be notless than $1,500,000 (US dollars one million and five hundred thousand) equivalent.

 

At least two (02) contracts for suppling power transformers withvoltage level from 110kV or above in the last three (03) years (from 2011 up to date). The value of each contact is no less thanten (10) billion Vietnamese dong or $560,000 (US dollars fivehundred and sixty thousand) equivalent. The Bidder  shall  demonstrate  that  the contracts have beensuccessfully completed.

At least two (02) certificates from end-users certifying that the goods from theproposed manufacturer have been put into operation successfully in substations with voltage level from 110kV orabove in the same tropical climate conditions for at least two (02) years.

7.      All bids must be accompanied by a Bid Securityof VND 300,000,000 (Three hundred million Vietnamesedong) or an equivalent amount in a freely convertible currency.

8.    The addresses referred to above are:

(1)  Tender Department 

Hanoi PowerCorporation,

No. 69 Dinh Tien Hoang, Hoan KiemDistrict, Hanoi City, Vietnam

Tel.84.4.22200852/22205262

Fax.84.4.22200853

(2)  Meeting room A2

Hanoi Power Corporation,

No. 69 Dinh Tien Hoang, Hoan Kiem District, Hanoi City,Vietnam

Tel.84.4.22200852/22205262

Fax.84.4.22200853